Report content as inappropriate


Original Text (Annotation: EAW023242 / 1058933)

' Filton By-Pass. Construction of the dual carriageway stopped when war broke out and was abandoned altogether when it was decided to extend the runway across the By-Pass and through Charlton village to support the Brabazon project. The path of the By-pass across the airfield is just detectable '