Report content as inappropriate


Original Text (Annotation: EAW002338 / 892813)

' Here another video of the Lead pipes being made at the WT Glover Cable Works in Manchester,these were transferred to waiting cable ships berthed in the Manchester Ship Canal via an overhead pulley and gantry system. https://archive.org/details/1945-06-04_Allies_Sieze_German_Loot_and_Criminals skip to the 3 minute mark for just the pipeline stuff. '